A phone case manufacturing RFQ should give every supplier the same product baseline and the same commercial assumptions. That means a clear case definition, shared quantities and pricing units, and one delivery request.

It also needs a reply format that shows which choices are still open.
When those pieces match, each custom phone case manufacturer quotes the same job, and you can compare replies line by line. When they don’t, suppliers fill the gaps with their own guesses, and their totals stop being comparable.
Set One Shared RFQ Baseline
Build the RFQ around three connected parts: the product to quote, the commercial basis for the price, and a way for suppliers to report assumptions or alternatives. You decide which requirements are confirmed, keeping any supplier suggestions separate from the baseline you asked them to price. This keeps every reply anchored to the same request, even when a factory proposes a different material or process.
Define the Phone Case and Configuration
Every supplier needs to identify the exact same case before they can price it. Give all candidates the same product identity, the same reference files, and a clear split between fixed and open attributes.
Identify the Device, Case Type, and Versions
Start with the fields that tell a supplier which build you mean:
-
Device make, model, and generation the case is designed for
-
Case type, described in your own terms
-
Each version, variant, or SKU in scope for this quote
-
Any versions you plan later but don’t want priced yet
These are buyer-defined inputs. They name the product. They don’t replace your own fit and design decisions for that device.
Attach an Agreed Product Reference
Send one reference set to everyone, such as a drawing, CAD file, artwork file, or physical sample description, and label each file with a revision number or date. That way a supplier who quotes “Rev B” and one who quotes “Rev C” can’t be mistaken for quoting the same thing. General manufacturing RFQ documentation examples from Zetwerk include part names, part numbers, revision numbers, engineering drawings, and CAD models. Treat that list as a general manufacturing reference. It isn’t a phone-case specification, so include only the references that apply to your product.
Mark Only Quote-Relevant Attributes
List the attributes that change the build or the price, then label each one confirmed, open, or optional alternative:
-
Material you have selected, or the options you are still weighing
-
Surface finish and color
-
Branding, such as logo method and placement
-
Retail or bulk packaging
Leave out details that won’t change the quote. If material is still open, say so plainly instead of naming one as if it were final.
Set a Common Commercial Quote Basis
Quotes line up only when every supplier prices the same quantity, unit, cost scope, and delivery request. Define each one, and ask suppliers to state anything they assumed differently.
State Quantities and the Pricing Unit
Give every candidate the same order quantity, or the same set of quantity tiers, such as 1,000, 5,000, and 10,000 units. Then name the pricing unit: each finished case, or a specified pack. Ask for a unit price and a total at each tier. This mirrors Microsoft’s RFQ quantity and charge example: in Dynamics 365, buyers ask vendors for prices and delivery times for the item quantities they specify. The same documentation also has buyers ask about incidental charges, such as shipping, or discounts for large orders.
Separate Costs That Change the Total
Ask for separate lines, where they apply, for:
-
Unit price
-
Setup fees
-
Samples
-
Packaging
-
Shipping
-
Any other one-time or incidental charge
Zetwerk’s manufacturing RFQ guide lists cost and delivery fields including unit pricing, tooling costs, setup fees, shipping costs, delivery location, and required lead time. Use it as a starting point, not a complete fee schedule. For each line, ask the supplier to mark it included, excluded, or not applicable.
Align Delivery and Commercial Assumptions
If you want delivery costs or dates, give every supplier the same destination, such as your US warehouse address, and the same requested delivery timing. State the currency, such as US dollars, along with any payment or delivery terms you have chosen. If a supplier quotes on a different basis, they should say so in writing. A total that includes freight to your door and one that stops at the factory gate are not the same number.
Make Open Choices Visible in Supplier Replies
Ask each supplier to send one quote for the confirmed baseline, then price any alternatives separately. Zetwerk’s supplier assumption advice recommends asking suppliers to state their assumptions and talking through the assumptions behind quotes that differ. A simple reply table, which you can send with the RFQ, puts that advice into practice:

| Column | What the supplier fills in |
|---|---|
| Buyer input and status | Input name; confirmed, open, or optional alternative |
| Supplier response and assumptions | Quoted value; assumptions or exclusions |
| Price and timing effect | Cost change; lead-time change |
| Clarification or deviation | Questions; departures from the request |
Use one row per RFQ input, covering both product and commercial items. Rows marked confirmed should roll up into the baseline total. Rows marked open or optional show what each choice would cost or how much time it would add. Suppliers won’t use this layout unless you ask, so attach it and require it in the reply.
Send the Same RFQ and Compare the Replies
Once the package is ready, follow a fixed sequence:
-
Send each candidate the same RFQ revision, reference files, and reply table.
-
Collect replies in the requested format. Send back any incomplete table before you compare.
-
Compare baseline prices and terms only across replies built on matching inputs.
-
Pull deviations, assumptions, and alternatives into a separate review. Resolve them with the supplier before you treat two proposals as like-for-like.
If you change a requirement partway through, issue a new revision to every candidate, not just one. To talk through an RFQ with our team, start from our store homepage.
FAQs
How many phone case manufacturers should get the same RFQ?
No sourced number applies to every project. What matters is that every candidate gets the identical package. Inviting only suppliers who can make your case type keeps the comparison focused.
What if I haven’t chosen a material or finish yet?
Mark the attribute as open and list the options you are considering. Then ask suppliers to price each option separately from the confirmed baseline, so the undecided choice doesn’t blur the core quote.
Should I ask for a quote validity period?
Yes, it’s worth asking. Zetwerk’s guide lists quote validity among commercial terms, and a stated validity window tells you how long a price holds while you finish comparing replies.
Can a supplier suggest changes to my design?
Yes, as long as the suggestion comes in as an alternative row with its own price and timing effect. That way you keep a clean baseline quote and can still weigh the supplier’s expertise.